Performance of waste heat boiler engineering
项目情况 Project situation |
锅炉形式 Boiler form |
备注 Remarks |
1#、2#,3#,4#AOD炉烟气余热回收系统 (余热锅炉4套、150吨蓄热器8台、除氧器4台) 1 #, 2 #, 3 #, and 4 # AOD furnace flue gas waste heat recovery system (4 sets of waste heat boilers, 8 sets of 150 ton heat storage devices, and 4 deaerators) |
翅片管/立式 Fin tube/vertical |
EPC总承包 EPC general contracting |
1#、2#,3#,4#,5#,6#,AOD炉烟气余热回收系统 (余热锅炉4套、120吨蓄热器8台、除氧器4台) 1 #, 2 #, 3 #, 4 #, 5 #, 6 # AOD furnace flue gas waste heat recovery system (4 sets of waste heat boilers, 8 sets of 120 ton heat storage devices, and 4 sets of deaerators) |
翅片管/立式 Fin tube/vertical |
EPC总承包 EPC general contracting |
100吨AD炉余热锅炉回收系统(膜式壁余热锅炉1套、除氧器1台) 100 ton AD furnace waste heat boiler recovery system (1 set of membrane wall waste heat boiler, 1 deaerator) |
翅片管/立式 Fin tube/vertical |
EPC总承包 EPC general contracting |
90吨一期1#、2#AOD炉余热锅炉回收系统 (余热锅炉2套、除氧器2台、蓄热器2套) 90 ton Phase I AOD Furnace 1 # and 2 # Waste heat boiler recovery system (2 sets of waste heat boilers, 2 deaerators, and 2 sets of heat accumulators) |
翅片管/立式 Fin tube/vertical |
锅炉供货 Boiler supply |
90吨二期3#、4#AOD炉余热锅炉回收系统 (余热锅炉2套、除氧器2台、蓄热器2套) 90 ton Phase II 3 # and 4 # AOD furnace waste heat boiler recovery system (2 sets of waste heat boilers, 2 deaerators, and 2 sets of heat storage) |
翅片管/立式 Fin tube/vertical |
锅炉供货 Boiler supply |
70吨三期5#、6#AOD炉余热锅炉回收系统 (余热锅炉2套、除氧器2台、蓄热器2套) 70 ton Phase III 5 # and 6 # AOD Boiler waste heat recovery system (2 sets of waste heat boilers, 2 deaerators, and 2 sets of heat storage devices) |
翅片管/立式 Fin tube/vertical |
锅炉供货 Boiler supply |
四炼150t量子电炉余热回收系统 (余热锅炉2套、200吨蓄热器2台、除氧器1台) Four refining 150t Quantum electric furnace waste heat recovery system (2 sets of waste heat boilers, 2 sets of 200 ton heat storage devices, and 1 deaerator) |
翅片管/立式 Fin tube/vertical |
锅炉供货 Boiler supply |
二炼220t量子电炉余热回收系统 (余热锅炉2套、170吨蓄热器4台、除氧器1台) Waste Heat Recovery System for 220t Quantum electric furnace in second refinery (2 sets of waste heat boilers, 4 sets of 170 ton heat storage devices, and 1 deaerator) |
翅片管/立式 Fin tube/vertical |
锅炉供货 Boiler supply |
年产800吨优特钢项目1#2#电炉余热锅炉 (余热锅炉2套、200吨蓄热器4台、除氧器2台) 1 # and 2 # electric furnace waste heat boilers for the annual production of 800 tons of special steel project (2 sets of waste heat boilers, 4 sets of 200 ton heat storage devices, and 2 sets of deaerators) |
翅片管/立式 Fin tube/vertical |
锅炉供货 Boiler supply |
年产800吨优特钢项目3#电炉余热锅炉 (余热锅炉2套、200吨蓄热器4台、除氧器2台) Annual production of 800 tons of special steel project # 3 electric furnace waste heat boiler (2 sets of waste heat boilers, 4 sets of 200 ton heat storage devices, and 2 sets of deaerators) |
翅片管/立式 Fin tube/vertical |
锅炉供货 Boiler supply |
120吨电炉余热锅炉回收系统 (余热锅炉1套、170吨蓄热器1台、除氧器1台) 120 ton electric furnace waste heat boiler recovery system (1 set of waste heat boiler, 1 170 ton heat storage device, 1 deaerator) |
翅片管/立式 Fin tube/vertical |
锅炉供货 Boiler supply |
100吨电炉余热锅炉回收系统 (膜式壁余热锅炉1套、除氧器1台) 100 ton electric furnace waste heat boiler recovery system (1 set of membrane wall waste heat boiler and 1 deaerator) |
膜式壁/光管/卧式 Membrane wall/Light tube/Horizontal |
EPC总承包 EPC general contracting |
75吨电炉余热锅炉回收系统 (卧式余热锅炉1套、除氧器1台) 75 ton electric furnace waste heat boiler recovery system (1 set of horizontal waste heat boiler and 1 deaerator) |
翅片管/立式 Fin tube/vertical |
EPC总承包 EPC general contracting |
90吨电炉余热锅炉回收系统 (立式余热锅炉1套、除氧器1台、蓄热器1套) 90 ton electric furnace waste heat boiler recovery system (1 set of vertical waste heat boiler, 1 deaerator, 1 set of thermal storage) |
膜式壁/卧式 Membrane wall/horizontal |
EPC总承包 EPC general contracting |
100吨电炉余热锅炉回收系统 (膜式壁余热锅炉1套、除氧器1台、170吨蓄热器2台) 100 ton electric furnace waste heat boiler recovery system (1 set of membrane wall waste heat boiler, 1 deaerator, 2 sets of 170 ton heat storage devices) |
膜式壁/光管/卧式 Membrane wall/Light tube/Horizontal |
EPC总承包 EPC general contracting |
120吨电炉余热锅炉回收系统 (膜式壁余热锅炉2套、除氧器1台、蓄热器2台) 120 ton electric furnace waste heat boiler recovery system (2 sets of membrane wall waste heat boilers, 1 deaerator, 2 heat storage devices) |
膜式壁/光管/立式 Membrane wall/Light tube/Vertical |
锅炉供货 Boiler supply |
120吨电炉余热锅炉回收系统 (膜式壁余热锅炉1套、除氧器1台) 120 ton electric furnace waste heat boiler recovery system (1 set of membrane wall waste heat boiler and 1 deaerator) |
膜式壁/光管/卧式 Membrane wall/Light tube/Horizontal |
EPC总承包 EPC general contracting |
70吨电炉余热锅炉回收系统 (膜式壁余热锅炉2套、除氧器2台、蓄热器4套) 70 ton electric furnace waste heat boiler recovery system (2 sets of membrane wall waste heat boilers, 2 deaerators, and 4 sets of heat storage devices) |
膜式壁/光管/卧式 Membrane wall/Light tube/Horizontal |
EPC总承包 EPC general contracting |
130吨电炉余热锅炉回收系统 (膜式壁余热锅炉1套、除氧器1台、蓄热器1套) 130 ton electric furnace waste heat boiler recovery system (1 set of membrane wall waste heat boiler, 1 deaerator, 1 set of heat storage) |
膜式壁/光管/卧式 Membrane wall/Light tube/Horizontal |
(EMC合同能源管理) (EMC Contract Energy Management) |
100吨电炉余热锅炉回收系统 (卧式余热锅炉1套、除氧器1台) 100 ton electric furnace waste heat boiler recovery system (1 set of horizontal waste heat boiler and 1 deaerator) |
膜式壁/光管/卧式 Membrane wall/Light tube/Horizontal |
锅炉供货 Boiler supply |
100吨电弧炉余热锅炉回收系统 (余热锅炉1套、除氧器1台、蓄热器1套) 100 ton electric arc furnace waste heat boiler recovery system (1 set of waste heat boiler, 1 deaerator, 1 set of heat storage) |
膜式壁/光管/卧式 Membrane wall/Light tube/Horizontal |
EPC总承包 EPC general contracting |
70吨电弧炉余热锅炉回收系统 (余热锅炉2套、除氧器2台、蓄热器2套) 70 ton electric arc furnace waste heat boiler recovery system (2 set of waste heat boiler, 2 deaerator, 2 set of heat storage) |
膜式壁/光管/卧式 Membrane wall/Light tube/Horizontal |
EPC总承包 EPC general contracting |
150吨电弧炉余热锅炉回收系统 (余热锅炉1套、除氧器1台、蓄热器1套) 150 ton electric arc furnace waste heat boiler recovery system (1 set of waste heat boiler, 1 deaerator, 1 set of heat storage) |
膜式壁/光管/卧式 Membrane wall/Light tube/Horizontal |
锅炉供货 Boiler supply |
120吨电弧炉余热锅炉回收系统 (余热锅炉1套、除氧器1台、蓄热器1套) 120 ton electric arc furnace waste heat boiler recovery system (1 set of waste heat boiler, 1 deaerator, 1 set of heat storage) |
膜式壁/光管/卧式 Membrane wall/Light tube/Horizontal |
锅炉供货 Boiler supply |
120吨电弧炉余热锅炉回收系统 (余热锅炉2套、除氧器2台、蓄热器2套 120 ton electric arc furnace waste heat boiler recovery system (2 set of waste heat boiler, 2 deaerator, 2 set of heat storage) |
膜式壁/光管/卧式 Membrane wall/Light tube/Horizontal |
锅炉供货 Boiler supply |
120吨电弧炉余热锅炉回收系统 (余热锅炉1套、除氧器2台、蓄热器2套) 120 ton electric arc furnace waste heat boiler recovery system (1 set of waste heat boiler, 2 deaerator, 2 set of heat storage) |
膜式壁/光管/卧式 Membrane wall/Light tube/Horizontal |
锅炉供货 Boiler supply |
转化炉烟气余热锅炉回收系统 (余热锅炉1套、除氧器1台) Converter flue gas waste heat boiler recovery system (1 set of waste heat boiler, 1 deaerator) |
热管/立式 Heat pipe/vertical |
锅炉供货 Boiler supply |
转化炉烟气余热锅炉回收系统 (余热锅炉1套、除氧器1台) Converter flue gas waste heat boiler recovery system (1 set of waste heat boiler, 1 deaerator) |
热管/立式 Heat pipe/vertical |
锅炉供货 Boiler supply |
年产53万吨冶炼烟气3#余热锅炉 Annual production of 530000 tons of smelting flue gas 3 # waste heat boiler |
热管/立式 Heat pipe/vertical |
锅炉供货 Boiler supply |
年产48万吨冶炼烟气2#余热锅炉 Annual production of 480000 tons of smelting flue gas 2 # waste heat boiler |
热管/立式 Heat pipe/vertical |
锅炉供货 Boiler supply |
年产40万吨冶炼烟气3#余热锅炉 Annual production of 400000 tons of smelting flue gas 3 # waste heat boiler |
热管/立式 Heat pipe/vertical |
锅炉供货 Boiler supply |
1# 2#转化炉烟气余热锅炉回收系统 (余热锅炉2套、除氧器2台) 1 # and 2 # converter flue gas waste heat boiler recovery system (2 sets of waste heat boilers and 2 deaerators) |
热管/立式 Heat pipe/vertical |
锅炉供货 Boiler supply |
预转化炉烟气余热锅炉回收系统 (余热锅炉2套、除氧器2台) Pre conversion furnace flue gas waste heat boiler recovery system (2 sets of waste heat boilers and 2 deaerators) |
热管/立式 Heat pipe/vertical |
锅炉供货 Boiler supply |
预转化炉烟气余热锅炉回收系统 (余热锅炉2套、除氧器2台) Pre conversion furnace flue gas waste heat boiler recovery system (2 sets of waste heat boilers and 2 deaerators) |
热管/立式 Heat pipe/vertical |
锅炉供货 Boiler supply |
转化炉烟气余热锅炉回收系统 (余热锅炉4套、除氧器2台) Pre conversion furnace flue gas waste heat boiler recovery system (4 sets of waste heat boilers and 2 deaerators) |
热管/立式 Heat pipe/vertical |
锅炉供货 Boiler supply |
阳级炉烟气余热锅炉1套 1 set of Yang level furnace flue gas waste heat boiler |
膜式壁/光管/卧式 Membrane wall/Light tube/Horizontal |
锅炉供货 Boiler supply |
轧钢加热炉余热锅炉1套 1 set of waste heat boiler for steel rolling heating furnace |
翅片管/立式 Fin tube/vertical |
锅炉供货 Boiler supply |
轧钢加热炉余热锅炉1套 1 set of waste heat boiler for steel rolling heating furnace |
翅片管/立式 Fin tube/vertical |
锅炉供货 Boiler supply |
轧钢加热炉余热锅炉1套 1 set of waste heat boiler for steel rolling heating furnace |
翅片管/立式 Fin tube/vertical |
锅炉供货 Boiler supply |
轧钢加热炉余热锅炉1套 1 set of waste heat boiler for steel rolling heating furnace |
翅片管/立式 Fin tube/vertical |
锅炉供货 Boiler supply |
轧钢加热炉余热锅炉1套 1 set of waste heat boiler for steel rolling heating furnace |
翅片管/立式 Fin tube/vertical |
锅炉供货 Boiler supply |
轧钢加热炉余热锅炉1套 1 set of waste heat boiler for steel rolling heating furnace |
翅片管/立式 Fin tube/vertical |
锅炉供货 Boiler supply |
轧钢加热炉余热锅炉4套 1 set of waste heat boiler for steel rolling heating furnace |
翅片管/立式 Fin tube/vertical |
锅炉供货 Boiler supply |
400M2烧结机4#余热锅炉 400M2 sintering machine 4 # waste heat boiler |
翅片管/立式 Fin tube/vertical |
锅炉供货 Boiler supply |
450M2烧结机5#余热锅炉 450M2 sintering machine 5 # waste heat boiler |
翅片管/立式 Fin tube/vertical |
锅炉供货 Boiler supply |
180M2烧结机3#余热锅炉 180M2 sintering machine 3 # waste heat boiler |
翅片管/立式 Fin tube/vertical |
锅炉供货 Boiler supply |
365m2烧结环冷机余热锅炉 365m2 sintering ring cooler waste heat boiler |
翅片管/立式 Fin tube/vertical |
锅炉供货 Boiler supply |
360m2烧结环冷机余热锅炉 360m2 sintering ring cooler waste heat boiler |
翅片管/立式 Fin tube/vertical |
锅炉供货 Boiler supply |